. Déroulement-d-'une-revue-numérique-d-'atelier....., 131 V.3.1 Revue globale d'architecture d'implantation d'atelier, p.131

S. Gomes and A. Bouras, Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World SE -43, IFIP Advances in Information and Communication Technology, pp.344-351
URL : https://hal.archives-ouvertes.fr/hal-01387954

R. Feno, A. Cauvin, and A. Ferrarini, Conceptual Design and Simulation of an Automotive Body Shop Assembly Line, Digital Enterprise Design and Management SE -14, Advances in Intelligent Systems and Computing, pp.139-140, 2014.
DOI : 10.1007/978-3-319-04313-5_14

C. Et-comité-de-lecture-feno, R. Cauvin, A. Ferrarini, and A. Black, Démarche de conception pour l'amélioration des performances des systèmes de production, in : Congrès International de Génie Industriel Design rules for implementing the Toyota Production System, International Journal of Production Research, vol.45, issue.16, pp.3639-3664, 2007.

G. Boothroyd, Design for Manufacture and Assembly: The Boothroyd-Dewhurst Experience, Design for X SE -2, pp.19-40, 1996.
DOI : 10.1007/978-94-011-3985-4_2

M. Bosch-mauchand, &. Bosch-mauchand, and . Vincent-cheutet, Usine Numérique. Techniques de l'ingénieur : Industrialisation et systèmes industriels, no. ref. article : ag3810, 2014.

U. Bracht and &. T. Masurat, The Digital Factory between vision and reality, Computers in Industry, vol.56, issue.4, pp.325-333, 2005.
DOI : 10.1016/j.compind.2005.01.008

A. Cauvin, S. Fournier, and A. Ferrarini, Disruption management in distributed organizations : a cooperative repair approach for reactive planning and scheduling, Progress in Economic Research, 2011.

. Chryssolouris, . Mavrikios, . Papakostas, G. Mourtzis, &. Michalos et al., Digital manufacturing: History, perspectives, and outlook, Proceedings of the Institution of Mechanical Engineers, pp.451-462, 2009.
DOI : 10.1080/00207540600942524

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.452.5271

M. Colorni, &. Paruccini, and . Roy, A-MCD-A -Aide Multi Critère à la Décision -Multiple Criteria Decision Aiding, 2001.

A. Dolgui, &. Proth, and J. , Les systèmes de production modernes, 2006.

M. Amro and . Farid, Reconfigurability Measurement in Automated Manufacturing Systems, 2007.

P. Girard, Analyse des décisions en conception, pp.1-12, 2001.

H. Garbie-14-]-ibrahim and . Garbie, A methodology for the reconfiguration process in manufacturing systems, Journal of Manufacturing Technology Management, vol.25, issue.6, pp.891-915, 2014.
DOI : 10.1080/00207540801946662

J. Herrmann, Design for production : Concepts and applications, Proceedings of the SME East Coast Region 3 annual, pp.1-9, 2003.

R. Holt and &. Barnes, Towards an integrated approach to ???Design for X???: an agenda for decision-based DFX research, Research in Engineering Design, vol.3, issue.2, pp.123-136, 2009.
DOI : 10.1017/CBO9781139173933

K. K. Hon and &. S. Xu, Impact of Product Life Cycle on Manufacturing Systems Reconfiguration, CIRP Annals - Manufacturing Technology, vol.56, issue.1, pp.455-458, 2007.
DOI : 10.1016/j.cirp.2007.05.109

Y. Koren and &. Shpitalni, Design of reconfigurable manufacturing systems, Journal of Manufacturing Systems, vol.29, issue.4, pp.130-141, 2010.
DOI : 10.1016/j.jmsy.2011.01.001

P. Nowak and &. Eynard, Managing design alternatives : from the alternatives model towards an aided design system Research survey, pp.1-15, 2005.

G. Pahl, H. Beitz, &. Schulz, and . Jarecki, Engineering Design -A Systematic Approach, 2007.

H. Pierreval and &. Paris, De l'optimisation de systèmes via la simulation à la configuration des systèmes via la simulation, Modélisation et Simulation MOSIM, 2001.

B. Poulet, &. Rose, and . Caillaud, Towards a Quality Referential for Performance in Design, pp.609-618, 2011.
DOI : 10.1007/978-3-642-15973-2_61

M. Raza, R. Kirkham, and &. Harrison, Knowledge Based Flexible and Integrated PLM System at Ford, pp.8-16, 2011.

C. Rösiö and &. Bruch, Focusing Early Phases in Production System Design

. La-décision-multicritère......, 52 II.5 Eléments comparatifs de la conception du produit et du process, II.4 Comparatif des méthodes, p.54