N. Absi and S. Kedad-sidhoum, The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs, Computers & Operations Research, vol.36, issue.11, pp.2926-2936, 2009.
URL : https://hal.archives-ouvertes.fr/emse-00429420

A. Aggarwal and J. K. Park, Improved algorithms for economic lot size problems, Oper. Res, vol.41, issue.3, pp.549-571, 1993.

V. Agrawal and S. Seshadri, Impact of uncertainty and risk aversion on price and order quantity in the newsvendor problem, Manufacturing & Service Operations Management, vol.2, issue.4, pp.410-423, 2000.

S. Ahmed, U. Çakmak, and A. Shapiro, Coherent risk measures in inventory problems, European Journal of Operational Research, vol.182, issue.1, pp.226-238, 2007.

M. A. Aloulou, A. Dolgui, and M. Y. Kovalyov, A bibliography of non-deterministic lot-sizing models, International Journal of Production Research, vol.52, issue.8, pp.2293-2310, 2014.
URL : https://hal.archives-ouvertes.fr/emse-00881465

E. Arikan and J. Fichtinger, The risk-averse newsvendor problem under spectral risk measures: A classification with extensions, European Journal of Operational Research, vol.256, issue.1, pp.116-125, 2017.

J. Arnold, S. Chapman, C. , and L. , Introduction to Materials Management. Pearson Education, 2007.

K. J. Arrow, T. Harris, and J. Marschak, Optimal inventory policy, Econometrica, vol.19, issue.3, pp.250-272, 1951.

P. Artzner, F. Delbaen, J. Eber, and D. Heath, Coherent measures of risk, Math. Finance, vol.9, issue.3, pp.203-228, 1999.

L. C. Barbosa and M. Friedman, Deterministic inventory lot size models-a general root law, Management Science, vol.24, issue.8, pp.819-826, 1978.

H. P. Benson, A finite algorithm for concave minimization over a polyhedron, Naval Research Logistics Quarterly, vol.32, issue.1, pp.165-177, 1985.

H. P. Benson, Deterministic algorithms for constrained concave minimization: A unified critical survey, Naval Research Logistics (NRL), vol.43, issue.6, pp.765-795, 1998.

J. R. Birge and F. Louveaux, Introduction to stochastic programming, Springer Series in Operations Research and Financial Engineering, 2011.

E. E. Bomberger, A dynamic programming approach to a lot size scheduling problem, Management Science, vol.12, issue.11, pp.778-784, 1966.

P. Carpentier, J. Chancelier, G. Cohen, D. Lara, and M. , Stochastic multi-stage optimization, At the crossroads between discrete time stochastic control and stochastic programming, vol.75, 2015.
DOI : 10.1007/978-3-319-18138-7

URL : https://hal.archives-ouvertes.fr/hal-01165572

C. Chang, An acquisition policy for a single item multi-supplier system with real-world constraints, Applied Mathematical Modelling, vol.30, issue.1, pp.1-9, 2006.

S. S. Chauhan and J. Proth, The concave cost supply problem, European Journal of Operational Research, vol.148, issue.2, pp.374-383, 2003.
DOI : 10.1016/s0377-2217(02)00407-1

S. Choi and A. Ruszczy´nskiruszczy´-ruszczy´nski, A risk-averse newsvendor with law invariant coherent measures of risk, Operations Research Letters, vol.36, issue.1, pp.77-82, 2008.

J. Delmas and B. Jourdain, Modèles aléatoires, Mathématiques & Applications, vol.57, 2006.

. Springer-verlag, Applications aux sciences de l'ingénieur et du vivant

W. A. Donaldson, Inventory replenishment policy for a linear trend in demand-an analytical solution, Journal of the Operational Research Society, vol.28, issue.3, pp.663-670, 1977.

M. Díaz-madroñero, J. Mula, and D. Peidro, A review of discrete-time optimization models for tactical production planning, International Journal of Production Research, vol.52, issue.17, pp.5171-5205, 2014.

F. Y. Edgeworth, The mathematical theory of banking, Journal of the Royal Statistical Society, vol.51, issue.1, pp.113-127, 1888.

A. Eynan and D. H. Kropp, Effective and simple EOQ-like solutions for stochastic demand periodic review systems, European Journal of Operational Research, vol.180, issue.3, pp.1135-1143, 2007.
DOI : 10.1016/j.ejor.2006.05.015

A. Federgruen and M. Tzur, A simple forward algorithm to solve general dynamic lot sizing models with n periods in 0(n log n) or 0(n) time, Management Science, vol.37, issue.8, pp.909-925, 1991.

D. J. Fiorotto, R. Jans, and S. A. De-araujo, Process flexibility and the chaining principle in lot sizing problems, International Journal of Production Economics, vol.204, pp.244-263, 2018.
DOI : 10.1016/j.ijpe.2018.07.030

M. Florian, J. K. Lenstra, R. Kan, and A. H. , Deterministic production planning: algorithms and complexity, Management Sci, vol.26, issue.7, pp.669-679, 1980.
DOI : 10.1287/mnsc.26.7.669

G. N. Frederickson and D. B. Johnson, The complexity of selection and ranking in x + y and matrices with sorted columns, Journal of Computer and System Sciences, vol.24, issue.2, pp.197-208, 1982.

M. F. Friedman, On a stochastic extension of the EOQ formula, European Journal of Operational Research, vol.17, issue.1, pp.125-127, 1984.

B. A. Frigyik, A. Kapila, and M. R. Gupta, Introduction to the dirichlet distribution and related processes, 2010.

H. Föllmer and A. Schied, Stochastic Finance: An Introduction in Discrete Time, vol.4, pp.157-206, 2004.

G. Gallego, New bounds and heuristics for (q, r) policies, Management Science, vol.44, issue.2, pp.219-233, 1998.
DOI : 10.1287/mnsc.44.2.219

A. Garavelli, Flexibility configurations for the supply chain management, International Journal of Production Economics, vol.85, issue.2, pp.141-153, 2003.
DOI : 10.1016/s0925-5273(03)00106-3

M. Garey and D. Johnson, Computers and Intractability: A Guide to the Theory of NP-Completeness. Series of books in the mathematical sciences, 1979.

B. Gavish and S. C. Graves, A one-product production/inventory problem under continuous review policy, Operations Research, vol.28, issue.5, pp.1228-1236, 1980.

J. Gayon, S. Benjaafar, and F. Véricourt, Using imperfect advance demand information in production-inventory systems with multiple customer classes, Manufacturing & Service Operations Management, vol.11, issue.1, pp.128-143, 2009.

J. Geunes, Operations Planning: Mixed Integer Optimization Models, Operations Research Series, 2014.

C. Gicquel and J. Cheng, A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand, Annals of Operations Research, vol.264, issue.1, pp.123-155, 2018.
URL : https://hal.archives-ouvertes.fr/hal-01467177

C. Gicquel, M. Minoux, and Y. Dallery, Capacitated lot sizing models: a literature review, 2008.
URL : https://hal.archives-ouvertes.fr/hal-00255830

S. K. Goyal, Determination of optimum packaging frequency of items jointly replenished, Management Science, vol.21, issue.4, pp.436-443, 1974.

L. Guimarães, D. Klabjan, and B. Almada-lobo, Modeling lotsizing and scheduling problems with sequence dependent setups, European Journal of Operational Research, vol.239, issue.3, pp.644-662, 2014.

, Gurobi Optimizer Reference Manual, 2018.

D. Gyulai, B. Kádár, and L. Monosotori, Robust production planning and capacity control for flexible assembly lines, 15th IFAC Symposium on Information Control Problems in Manufacturing, vol.48, pp.2312-2317, 2015.

D. Gyulai, A. Pfeiffer, and L. Monostori, Robust production planning and control for multi-stage systems with flexible final assembly lines, International Journal of Production Research, vol.55, issue.13, pp.3657-3673, 2017.

G. G. Hadley and T. M. Whitin, Analysis of inventory systems, 1963.

F. W. Harris, How many parts to make at once. Factory, The Magazine of Management, vol.10, pp.135-136, 1913.

T. Hastie, R. Tibshirani, and J. Friedman, The elements of statistical learning, Springer Series in Statistics, 2009.

D. S. Hochbaum, Lower and upper bounds for the allocation problem and other nonlinear optimization problems, Mathematics of Operations Research, vol.19, issue.2, pp.390-409, 1994.

J. Hong and J. C. Hayya, Just-in-time purchasing: Single or multiple sourcing?, International Journal of Production Economics, vol.27, issue.2, pp.175-181, 1992.

C. H. Hsieh, Optimization of fuzzy production inventory models, Information Sciences, vol.146, issue.1, pp.29-40, 2002.

J. P. Ignizio, Cycle time reduction via machine-to-operation qualification, International Journal of Production Research, vol.47, issue.24, pp.6899-6906, 2009.

A. K. Jain, Data clustering: 50 years beyond k-means, Award winning papers from the 19th International Conference on Pattern Recognition (ICPR), vol.31, pp.651-666, 2010.

W. C. Jordan and S. C. Graves, Principles on the benefits of manufacturing process flexibility, Management Science, vol.41, issue.4, pp.577-594, 1995.

B. Karimi, S. M. Fatemi-ghomi, and J. M. Wilson, The capacitated lot sizing problem: a review of models and algorithms, Omega, vol.31, issue.5, pp.365-378, 2003.

T. Kim, Y. Hong, and J. Lee, Joint economic production allocation and ordering policies in a supply chain consisting of multiple plants and a single retailer, International Journal of Production Research, vol.43, issue.17, pp.3619-3632, 2005.

A. J. Kleywegt, A. Shapiro, and T. H. Mello, The sample average approximation method for stochastic discrete optimization, SIAM Journal on Optimization, vol.12, issue.2, pp.479-502, 2002.

L. L. Koste and M. K. Malhotra, A theoretical framework for analyzing the dimensions of manufacturing flexibility, Journal of Operations Management, vol.18, issue.1, pp.75-93, 1999.

S. Kotz, N. Balakrishnan, J. , and N. L. , Continuous Multivariate Distributions, Models and Applications. Wiley Series in Probability and Statistics, vol.1, 2000.

H. Lee and J. Yao, Economic order quantity in fuzzy sense for inventory without backorder model. Fuzzy Sets and Systems, vol.105, pp.13-31, 1999.

S. Lin and S. Su, The optimal inventory policy of production management, Engineering, issue.5, p.5, 2013.

P. B. Macedo, D. Alem, M. Santos, M. L. Junior, and A. Moreno, Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs, International Journal of Advanced Manufacturing Technology, vol.82, issue.5, pp.1241-1257, 2016.

J. G. Madigan, Scheduling a multi-product single machine system for an infinite planning period, Management Science, vol.14, issue.11, pp.713-719, 1968.

P. Meena, S. Sarmah, and A. Sarkar, Sourcing decisions under risks of catastrophic event disruptions, Transportation Research Part E: Logistics and Transportation Review, vol.47, issue.6, pp.1058-1074, 2011.

M. Minoux, Robust and stochastic multistage optimisation under markovian uncertainty with applications to production/inventory problems, International Journal of Production Research, vol.56, issue.1-2, pp.565-583, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02077115

S. K. Mukhopadhyay and H. Ma, Joint procurement and production decisions in remanufacturing under quality and demand uncertainty, Special Issue on Operations Strategy and Supply Chains Management, vol.120, issue.1, pp.5-17, 2009.

J. Mula, R. Poler, J. P. García-sabater, and F. Lario, Models for production planning under uncertainty: A review, International Journal of Production Economics, vol.103, issue.1, pp.271-285, 2006.

A. Muriel, A. Somasundaram, and Y. Zhang, Impact of partial manufacturing flexibility on production variability, Manufacturing & Service Operations Management, vol.8, issue.2, pp.192-205, 2006.

A. H. Nobil, A. H. Sedigh, and L. E. Cárdenas-barrón, A multi-machine multi-product epq problem for an imperfect manufacturing system considering utilization and allocation decisions, Expert Systems with Applications, vol.56, pp.310-319, 2016.

K. Ohno and T. Ishigaki, A multi-item continuous review inventory system with compound poisson demands, Mathematical Methods of Operations Research, vol.53, issue.1, pp.147-165, 2001.

G. Padmanabhan and P. Vrat, Inventory model with a mixture of back orders and lost sales, International Journal of Systems Science, vol.21, issue.8, pp.1721-1726, 1990.

K. S. Park, Inventory model with partial backorders, International Journal of Systems Science, vol.13, issue.12, pp.1313-1317, 1982.

K. S. Park, Fuzzy-set theoretic interpretation of economic order quantity, IEEE Transactions on Systems, Man, and Cybernetics, vol.17, issue.6, pp.1082-1084, 1987.

S. S. Park, T. Kim, and Y. Hong, Production allocation and shipment policies in a multiple-manufacturer-single-retailer supply chain, International Journal of Systems Science, vol.37, issue.3, pp.163-171, 2006.

Y. Pochet and L. Wolsey, Production Planning by Mixed Integer Programming. Springer Series in Operations Research and Financial Engineering, 2006.

M. Raghavachari, On connections between zero-one integer programming and concave programming under linear constraints, Operations Research, vol.17, issue.4, pp.680-684, 1969.

M. Resh, M. Friedman, and L. C. Barbosa, On a general solution of the deterministic lot size problem with time-proportional demand, Operations Research, vol.24, issue.4, pp.718-725, 1976.

J. Rezaei and M. Davoodi, A deterministic, multi-item inventory model with supplier selection and imperfect quality, Applied Mathematical Modelling, vol.32, issue.10, pp.2106-2116, 2008.

R. Rockafellar and S. Uryasev, Conditional value-at-risk for general loss distributions, Journal of Banking & Finance, vol.26, issue.7, pp.1443-1471, 2002.

R. T. Rockafellar and S. Uryasev, Optimization of conditional value-at-risk, Journal of Risk, vol.2, pp.21-41, 2000.

M. J. Rosenblatt, Y. T. Herer, and I. Hefter, Note. an acquisition policy for a single item multi-supplier system, Management Science, vol.44, issue.11, pp.96-100, 1998.

A. Rozenknop, R. Wolfler-calvo, L. Alfandari, D. Chemla, and L. Létocart, Solving the electricity production planning problem by a column generation based heuristic, Journal of Scheduling, vol.16, issue.6, pp.585-604, 2013.

J. Rubaszewski, A. Yalaoui, L. Amodeo, N. Yalaoui, and H. Mahdi, A capacitated lotsizing problem with limited number of changes, International Conference on Industrial Engineering and Systems Management, 2011.

M. Salameh, N. Abboud, A. El-kassar, and R. Ghattas, Continuous review inventory model with delay in payments, International Journal of Production Economics, vol.85, issue.1, pp.91-95, 2003.

S. S. Sana, The stochastic EOQ model with random sales price, Appl. Math. Comput, vol.218, issue.2, pp.239-248, 2011.

A. K. Sethi and S. P. Sethi, Flexibility in manufacturing: A survey, International Journal of Flexible Manufacturing Systems, vol.2, issue.4, pp.289-328, 1990.

A. Shapiro, D. Dentcheva, R. Ruszczy´nski, and A. , Lectures on Stochastic Programming. Society for Industrial and Applied Mathematics, 2009.

E. A. Silver, A simple method of determining order quantities in joint replenishments under deterministic demand, Management Science, vol.22, issue.12, pp.1351-1361, 1976.

L. V. Snyder, M. P. Scaparra, M. S. Daskin, and R. L. Church, Planning for Disruptions in Supply Chain Networks, pp.234-257, 2006.

M. Stevenson and M. Spring, Flexibility from a supply chain perspective: definition and review, International Journal of Operations & Production Management, vol.27, issue.7, pp.685-713, 2007.

E. W. Taft, The most economical production lot. Iron Age, vol.101, pp.1410-1412, 1918.

S. Tarim and B. G. Kingsman, The stochastic dynamic production/inventory lotsizing problem with service-level constraints, International Journal of Production Economics, vol.88, issue.1, pp.105-119, 2004.

D. Ta¸sta¸s, M. Gendreau, O. Jabali, and R. Jans, A capacitated lot sizing problem with stochastic setup times and overtime, European Journal of Operational Research, 2018.

H. Tempelmeier, Stochastic Lot Sizing Problems, pp.313-344, 2013.
DOI : 10.1007/978-1-4614-6777-9_10

B. Tomlin and Y. Wang, On the value of mix flexibility and dual sourcing in unreliable newsvendor networks, Manufacturing & Service Operations Management, vol.7, issue.1, pp.37-57, 2005.

H. Tuy, Concave programming under linear constraints, Soviet Mathematics, vol.5, pp.1437-1440, 1964.

C. P. Van-hoesel and A. P. Wagelmans, Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems, Math. Oper. Res, vol.26, issue.2, pp.339-357, 2001.

,. Van-houtum and W. Zijm, On the relation between cost and service models for general inventory systems, Number 1522 in Memorandum / Faculty of Mathematical Sciences, 2000.

R. Vershynin, Introduction to the non-asymptotic analysis of random matrices, 2010.

P. Vrat and G. Padmanabhan, An inventory model under inflation for stock dependent consumption rate items. Engineering Costs and Production Economics, vol.19, pp.379-383, 1990.

A. Wagelmans, S. Van-hoesel, and A. Kolen, Economic lot sizing: An o(n log n) algorithm that runs in linear time in the wagner-whitin case, Operations Research, vol.40, pp.145-156, 1992.

H. M. Wagner and T. M. Whitin, Dynamic version of the economic lot size model, Management Science, vol.5, issue.1, pp.89-96, 1958.

C. A. Yano and H. L. Lee, Lot sizing with random yields: A review, Operations Research, vol.43, issue.2, pp.311-334, 1995.

M. Yao and S. Minner, Review of multi-supplier inventory models in supply chain management: An update, 2017.

W. I. Zangwill, A backlogging model and a multi-echelon model of a dynamic economic lot size production system-a network approach, Management Science, vol.15, issue.9, pp.506-527, 1969.

H. Ziegler, Solving certain singly constrained convex optimization problems in production planning, Operations Research Letters, vol.1, issue.6, pp.246-252, 1982.

S. Ziukov, A literature review on models of inventory management under uncertainty, Business Systems & Economics, vol.5, pp.26-35, 2015.