M. Rezaei-malek, A. Siadat, J. Dantan, and R. Tavakkoli-moghaddam, A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty, International Journal of Production Research, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02436389

M. Rezaei-malek, M. Mohammadi, J. Dantan, A. Siadat, and R. Tavakkoli-moghaddam, A review on optimisation of part quality inspection planning in a multistage manufacturing system, International Journal of Production Research, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02461149

M. Rezaei-malek, R. Tavakkoli-moghaddam, A. Siadat, and J. Dantan, A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02436779

, The International Journal of Advanced Manufacturing Technology, vol.96, issue.9-12, pp.3633-3650

M. Rezaei-malek, A. Siadat, J. Dantan, and R. Tavakkoli-moghaddam, An approximation approach for an integrated part quality inspection and preventive maintenance planning in a nonlinear deteriorating serial multi-stage manufacturing system, IFAC-PapersOnLine, vol.51, issue.11, pp.270-275, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02436446

A. Azadeh and M. S. Sangari, A metaheuristic method for optimising inspection strategies in serial multistage processes, International Journal of Productivity and Quality Management, vol.6, pp.289-303, 2010.

A. Azadeh, M. S. Sangari, and A. S. Amiri, A particle swarm algorithm for inspection optimization in serial multi-stage processes, Applied Mathematical Modelling, vol.36, pp.1455-1464, 2012.

A. Azadeh, M. S. Sangari, E. Sangari, and S. Fatehi, A particle swarm algorithm for optimising inspection policies in serial multistage production processes with uncertain inspection costs, International Journal of Computer Integrated Manufacturing, vol.28, pp.766-780, 2015.

A. Azadeh, M. Rezaei-malek, F. Evazabadian, and M. Sheikhalishahi, Improved design of CMS by considering operators decision-making styles, International Journal of Production Research, vol.53, pp.3276-3287, 2015.

A. Azadeh, M. Ravanbakhsh, M. Rezaei-malek, M. Sheikhalishahi, and A. Taheri-moghaddam, Unique NSGA-II and MOPSO algorithms for improved dynamic cellular manufacturing systems considering human factors, Applied Mathematical Modelling, vol.48, pp.655-672, 2017.

T. Avinadav and T. Raz, Economic optimization in a fixed sequence of unreliable inspections, Journal of the Operational Research Society, vol.54, pp.605-613, 2003.

D. Bai and H. Yun, Optimal allocation of inspection effort in a serial multi-stage production system, Computers and Industrial Engineering, vol.30, pp.387-396, 1996.

D. P. Ballou and H. L. Pazer, The impact of inspector fallibility on the inspection policy in serial production systems, Management Science, vol.28, pp.387-399, 1982.

D. P. Ballou and H. L. Pazer, Process improvement versus enhanced inspection in optimized systems, International Journal of Production Research, vol.23, pp.1233-1245, 1985.

M. Barad, A break even quality level a approach to location of inspection station in a multi-stage production process, International Journal of Production Research, vol.28, pp.29-45, 1990.

C. S. Beightler and L. G. Mitten, Design of an optimal sequence of interrelated sampling plans, Journal of the American Statistical Association, vol.59, pp.96-104, 1964.

M. Ben-daya and S. O. Duffuaa, Maintenance and quality: the missing link, Journal of Quality in Maintenance Engineering, vol.1, pp.20-26, 1995.

M. Ben-daya and M. Rahim, Integrated production, quality and maintenance References 92 models: an overview, Integrated Models in Production Planning, Inventory, Quality and Maintenance, pp.3-28, 2001.

R. R. Britney, Optimal screening plans for nonserial production systems, Management Science, vol.18, pp.550-559, 1972.

E. D. Brown, Some mathematical models of inspection along a production line (No. TR-36), 1968.

A. K. Chakravarty and A. Shtub, Strategic allocation of inspection effort in a serial, multi-product production system, IIE Transactions, vol.19, pp.13-22, 1987.

J. D. Chen, D. Yao, and S. Zheng, Quality control for products supplied with warranty, Operations Research, vol.46, pp.107-115, 1998.

T. J. Chen and A. C. Thornton, Quantitative selection of inspection plans, Proceedings of the 1999 ASME Design Engineering Technical Conferences, 1999.

P. B. Chevalier and L. W. Wein, Inspection for circuit board assembly, Management Science, vol.43, pp.1198-1213, 1997.

M. Colledani, T. Tolio, A. Fischer, B. Lung, G. Lanza et al., Design and management of manufacturing systems for production quality, CIRP Annals -Manufacturing Technology, vol.63, pp.773-796, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01056111

C. N. Deliman and M. R. Feldman, Optimization of process improvement and inspection location for serial manufacturing, International Journal of Production Research, vol.34, pp.395-405, 1996.

D. L. Dietrich and J. L. Sanders, A Bayesian quality assurance model for a multistage production process, ASQC Technical Conference Transactions, pp.338-348, 1974.

S. S. Ercan, Systems approach to the multistage manufacturing connected-unit situation, Naval Research Logistics Quarterly, vol.19, pp.493-500, 1972.

S. S. Ercan, M. Z. Hassan, and A. Taulananda, Cost minimizing single sampling plans with AIQL and AOQL constraints, Management Science, vol.20, pp.1112-1121, 1974.

H. Emmons and G. Rabinowitz, Inspection allocation for multistage deteriorating production systems, IIE Transactions, vol.34, pp.1031-1041, 2002.

N. L. Enrick, Towards optimization of inspection allocation Part I and II, Industrial Management, vol.17, issue.4, pp.7-11, 1975.

G. D. Eppen and G. E. Hurst, Optimal location of inspection station in a multistage production process, Management Science, vol.20, pp.1194-1200, 1974.

Q. Feng and K. C. Kapur, Economic design of specifications for 100% inspection with imperfect measurement systems, Quality Technology and Quantitative Management, vol.3, pp.127-144, 2006.

R. J. Ferreira, A. T. Almeida, and C. Cavalcante, A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis, Reliability Engineering and System Safety, vol.94, pp.905-912, 2009.

J. W. Foster, C. O. Malave, and J. R. Villalobos, Flexible inspection within an aggregated information environment, Computers & Industrial Engineering, vol.19, pp.224-228, 1990.

A. Garcia-diaz, J. W. Foster, and M. Bonyuet, Dynamic programming analysis of special multi-stage inspection systems, IIE Transactions, vol.16, pp.115-125, 1984.

M. R. Garey, Optimal test point selection for sequential manufacturing processes, The Bell System Technical Journal, vol.51, pp.291-300, 1972.

H. R. Golmakani, Condition-based inspection scheme for condition-based maintenance, International Journal of Production Research, vol.50, pp.3920-3935, 2012.

S. K. Goyal, A. Gunasekaran, T. Martikainen, and P. Yli-olli, Integrating production and quality control policies: A survey, European Journal of Operational Research, vol.69, pp.1-13, 1993.

H. Gurnani, Z. Drezner, and R. Akella, Capacity planning under different inspection strategies, European Journal of Operations Research, vol.89, pp.302-312, 1996.

I. S. Gunter and A. L. Swanson, Inspector location in convergent production units, International Journal of Production Research, vol.23, pp.1153-1169, 1985.

L. A. Hadidi, U. M. Al-turki, and A. Rahim, Integrated models in production planning and scheduling, maintenance and quality: a review, International Journal of Industrial and Systems Engineering, vol.10, pp.21-50, 2012.

T. Hanne and S. Nickel, A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects, European Journal of Operational Research, vol.167, pp.663-678, 2005.

A. Hassan and D. T. Pham, Optimisation of inspection stations by using simulated annealing, International Journal for Manufacturing Science and Technology, vol.2, p.59, 2000.

S. J. Hsu, A hybrid inspection system for the multistage production process, International Journal of Production Research, vol.22, pp.63-69, 1984.

E. Hurst, Imperfect inspection in a in a multi-workstation production process, Management Science, vol.20, pp.378-384, 1973.

M. E. Jewkes, Optimal inspection effort and scheduling for a manufacturing process with repair, European Journal of Operational Research, vol.85, pp.340-351, 1995.

B. Iung, E. Levrat, A. C. Marquez, and H. Erbe, Conceptual framework for emaintenance: Illustration by e-maintenance technologies and platforms, Annual Reviews in Control, vol.33, pp.220-229, 2009.
URL : https://hal.archives-ouvertes.fr/hal-00438191

V. Kakade, J. F. Valenzuela, and J. S. Smith, An optimization model for selective inspection in serial manufacturing systems, International journal of production research, vol.42, pp.3891-3909, 2004.

K. S. Kang, A. K. Ebeling, and S. La, The optimal location of inspection stations using a rule-based methodology, Computer and Industrial Engineering, vol.19, pp.272-275, 1990.

P. Korytkowski, A genetic algorithm with tournament selection for optimising inspection allocation in multiproduct multistage production systems, International Journal of Simulation and Process Modelling, vol.6, pp.238-244, 2011.

Y. Kuo, Optimal adaptive control policy for joint machine maintenance and product quality control, European Journal of Operational Research, vol.171, pp.586-597, 2006.

H. L. Lee and M. J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system, Management Science, vol.33, pp.1125-1136, 1987.

J. Lee and S. Unnikrishnan, Planning quality inspection operations in multistage manufacturing systems with inspection errors, International Journal of Production Research, vol.36, pp.141-155, 1998.

G. F. Lindsay and A. B. Bishop, Allocation of screening inspection efforts -A dynamic programming approach, Management Science, vol.10, pp.342-352, 1964.

Q. Liu, M. Dong, W. Lv, and C. Ye, Manufacturing system maintenance based on dynamic programming model with prognostics information, Journal of Intelligent Manufacturing, 2017.

Y. Lu, Industry 4.0: A survey on technologies, applications and open research issues, Journal of Industrial Information Integration, vol.6, pp.1-10, 2017.

S. S. Mandroli, A. K. Shrivastava, and Y. Ding, A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes, IIE Transactions, vol.38, pp.309-328, 2006.

G. Mavrotas, Effective implementation of thee-constraint method in multi objective mathematical programming problems, Applied Mathematics and Computation, vol.213, pp.455-465, 2009.

S. Mirdamadi, Decision support system for the generation of inspection processes by the federation of business expertise (Doctoral dissertation, 2014.

M. Mohammadi, A multi-objective optimization framework for an inspection planning problem under uncertainty and breakdown, Arts et Metiers ParisTech, 2015.
URL : https://hal.archives-ouvertes.fr/tel-01345201

M. Mohammadi, A. Siadat, J. Dantan, and R. Tavakkoli-moghaddam, Mathematical modelling of a robust inspection process plan: Taguchi and Monte Carlo methods, International Journal of Production Research, vol.53, pp.2202-2224, 2015.
URL : https://hal.archives-ouvertes.fr/hal-01794852

M. Mohammadi, J. Y. Dantan, A. Siadat, and R. Tavakkoli-moghaddam, A biobjective robust inspection planning model in a multi-stage serial production system, International Journal of Production Research, vol.56, pp.1432-1457, 2017.
URL : https://hal.archives-ouvertes.fr/hal-02369513

D. C. Montgomery, Introduction to Statistical Quality Control, 2009.

S. M. Mousavi, S. Mirdamadi, A. Siadat, J. Dantan, and R. Tavakkoli-moghaddam, An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms, Engineering Applications of Artificial Intelligence, vol.39, pp.157-167, 2015.
URL : https://hal.archives-ouvertes.fr/hal-02519423

P. N. Muchiri, L. Pintelon, H. Martin, and P. Chemweno, Modelling maintenance effects on manufacturing equipment performance: results from simulation analysis, International Journal of Production Research, vol.52, pp.3287-3302, 2014.

Y. Narahari and L. M. Khan, Modelling re-entrant manufacturing systems with inspection stations, Journal of Manufacturing Systems, vol.15, pp.367-378, 1996.

R. P. Nicolai and R. Dekker, Optimal maintenance of multi-component systems: a review, pp.263-286, 2008.

M. Oppermann, W. Sauer, H. Wohlrabe, and T. Zerna, New quality cost models to optimize inspection strategies, IEEE Transactions on Electronics Packaging Manufacturing, vol.26, pp.328-337, 2003.

M. Penn and T. Raviv, Optimizing the quality control station configuration, Naval Research Logistics (NRL), vol.54, pp.301-314, 2007.

M. Penn and T. Raviv, A polynomial time algorithm for solving a quality control station configuration problem, Discrete Applied Mathematics, vol.156, pp.412-419, 2008.

M. H. Peters and W. W. Williams, Location of quality inspection stations: an experimental assessment of five normative heuristics, Decision Sciences, vol.15, pp.389-408, 1984.

M. H. Peters and W. W. Williams, Economic design of quality monitoring efforts for multi-stage production systems, IIE Transactions, vol.19, pp.81-87, 1987.

M. S. Pishvaee, J. Razmi, and S. Torabi, Robust possibilistic programming for socially responsible supply chain network design: A new approach. Fuzzy Sets and Systems, vol.206, pp.1-20, 2012.

P. M. Pruzan and J. T. Jackson, A dynamic programming application in production line inspection, vol.9, pp.73-81, 1967.

G. Rabinowitz and H. Emmons, Optimal and heuristic inspection schedules for multistage production systems, IIE transactions, vol.29, pp.1063-1071, 1997.

H. Rau and Y. H. Chu, Inspection allocation planning with two types of workstation: WVD and WAD, International Journal of Advanced Manufacturing Technology, vol.25, pp.947-953, 2005.

H. Rau and K. H. Cho, Genetic algorithm modeling for the inspection allocation in reentrant production systems, Expert Systems with Applications, vol.36, pp.11287-11295, 2009.

H. Rau and K. H. Cho, Particle swarm optimization with mutation for the inspection allocation in reentrant production systems, IEEE International Conference on Machine Learning and Cybernetics (ICMLC), vol.3, pp.1025-1030, 2011.

T. Raz, A survey of models for allocating inspection effort in multistage production systems, Journal of Quality Technology, vol.18, pp.239-247, 1986.

T. Raz and M. Kaspi, Location and sequencing of imperfect inspection operations in serial multi-stage production systems, International Journal of Production Research, vol.29, pp.1645-1659, 1991.

R. Rebello, A. Agnetis, and P. B. Mirchandani, Specialized inspection problems in serial production systems, European Journal of Operational Research, vol.80, pp.277-296, 1995.

M. Rezaei-malek, R. Tavakkoli-moghaddam, N. Cheikhrouhou, and A. Taheri-moghaddam, An approximation approach to a trade-off among efficiency, efficacy, and References 97 equity for relief prepositioning in disaster management, Transportation Research Part E, vol.93, pp.485-509, 2016.

M. Rezaei-malek, J. Razmi, R. Tavakkoli-moghaddam, and A. Taheri-moghaddam, Towards a psychologically consistent cellular manufacturing system, International Journal of Production Research, vol.55, pp.492-518, 2017.

S. Saxena, C. M. Chang, H. B. Chow, and J. Lee, Evaluation of heuristics for inspection station allocation in serial production systems, The Proceedings of the 1990 Winter Simulation Conference, pp.919-922, 1990.

A. G. Shetwan, V. I. Vitanov, and B. Tjahjono, Allocation of quality control stations in multistage manufacturing systems, Computers and Industrial Engineering, vol.60, pp.473-484, 2011.

Y. R. Shiau, Inspection resource assignment in a multistage manufacturing system with inspection error model, International Journal of Production Research, vol.40, pp.1787-1806, 2002.

Y. R. Shiau, Inspection allocation planning for a multiple quality characteristic advanced manufacturing system, International Journal of Advanced Manufacturing Technology, vol.21, pp.494-500, 2003.

Y. R. Shiau, Quick decision-making support for inspection allocation planning with rapidly changing customer requirements, International Journal of Advanced Manufacturing Technology, vol.22, pp.633-640, 2003.

Y. R. Shiau, M. H. Lin, and W. C. Chuang, Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm, International Journal of Advanced Manufacturing Technology, vol.33, pp.746-755, 2007.

W. S. Shin, S. M. Hart, and H. F. Lee, Strategic allocation of inspection stations for a flow assembly line: a hybrid procedure, IIE Transactions, vol.27, pp.707-715, 1995.

M. Taneja and N. Viswanadham, Inspection allocation in manufacturing systems a genetic algorithm approach, The Proceedings of the 1994 IEEE California international conference on robotics and automation, vol.4, pp.3537-3542, 1994.

C. S. Tang, Designing an optimal production system with inspection, European Journal of Operational Research, vol.52, pp.45-54, 1991.

G. K. Tayi and D. P. Ballou, An integrated production inventory model with reprocessing and inspection, International Journal of production Research, vol.26, pp.1299-1315, 1988.

R. R. Trippi, An on-line computational model for inspection resource allocation, Journal of Quality Technology, vol.6, pp.167-174, 1974.

R. R. Trippi, The warehouse location formulation as a special type of inspection problem, Management Science, vol.21, pp.986-988, 1975.

A. Vaghefi and V. Sarhangian, Contribution of simulation to the optimization of inspection plans for multi-stage manufacturing systems, Computers and Industrial Engineering, vol.57, pp.1226-1234, 2009.

F. J. Valenzuela, S. J. Smith, and S. J. Evans, Allocating solder-paste printing inspection in high volume electronics manufacturing, IIE Transactions, vol.36, pp.1171-1181, 2004.

S. Van-volsem and H. Van-landeghem, Optimizing Inspection Strategies for Multi-Stage Processes: An Exploratory Modeling Framework and Simulation, Qualite? et Su?rete? de Fonctionnement, pp.2-9, 2003.

S. Van-volsem, W. Dullaert, and H. Van-landeghem, An evolutionary algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes, European Journal of Operational Research, vol.179, pp.621-633, 2007.

S. Van-volsem, Joint optimisation of all inspection parameters for multistage processes: evolutionary algorithm and simulation, International Journal of Innovative Computing and Applications, vol.2, pp.170-177, 2010.

M. H. Veatch, Inspection strategies for multistage production systems with time varying quality, International Journal of Production Research, vol.38, pp.837-853, 2000.

A. Verduzco, J. R. Villalobos, and B. Vega, Information-based inspection allocation for real-time inspection systems, Journal of Manufacturing Systems, vol.20, pp.13-22, 2001.

J. R. Villalobos and J. W. Foster, Some results from model of dynamic inspection allocation, Computers and Industrial Engineering, vol.21, pp.355-358, 1991.

J. R. Villalobos, J. W. Foster, and R. L. Disney, Flexible inspection systems for serial multi-stage production systems, IIE Transactions, vol.25, pp.16-26, 1993.

N. Viswanadham, S. Sharma, and M. Taneja, Inspection allocation in manufacturing systems using stochastic search techniques, IEEE Transactions on Systems, Man and Cybernetics, Part A (Systems & Humans), vol.26, pp.222-230, 1996.

L. S. White, The analysis of a simple class of multi-stage inspection plans, Management Science, vol.12, pp.685-693, 1966.

H. P. Williams, Model Building in Mathematical Programming, 2013.

W. Winchell, Inspection and measurement in manufacturing: keys to process planning and improvement. Society of Manufacturing Engineers, 1996.

W. K. Woo and J. E. Metcalfe, Optimal allocation of inspection effort in multistage manufacturing processes, Western Electric Engineer, vol.16, pp.3-16, 1972.

D. D. Yao and S. Zheng, Sequential inspection under capacity constraints, Operations Research, vol.47, pp.410-422, 1999.

D. D. Yao and S. Zheng, Coordinated quality control in a two-stage system, IEEE Transactions on Automatic Control, vol.44, pp.1166-1179, 1999.

B. J. Yum and E. D. Mcdowell, The optimal allocation of inspection effort in a class of nonserial production systems, IIE Transactions, vol.13, pp.285-293, 1981.

J. B. Yum and D. E. Mcdowell, Optimal inspection policies in serial production system including scrap rework and repair: An MILP approach, International Journal of Production Research, vol.25, pp.1451-1464, 1987.

B. Zahiri, R. Tavakkoli-moghaddam, and M. S. Pishvae, A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty, Computers & Industrial Engineering, vol.74, pp.139-148, 2014.

S. Zheng, Dynamic quality control in assembly systems, IIE Transactions, vol.32, pp.797-806, 2000.

M. Zhou and C. Zhao, An optimization model and multiple matching heuristics for quality planning in manufacturing systems, Computers and industrial engineering, vol.42, pp.91-101, 2002.