A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty, International Journal of Production Research, 2018. ,
URL : https://hal.archives-ouvertes.fr/hal-02436389
A review on optimisation of part quality inspection planning in a multistage manufacturing system, International Journal of Production Research, 2018. ,
URL : https://hal.archives-ouvertes.fr/hal-02461149
A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system, 2018. ,
URL : https://hal.archives-ouvertes.fr/hal-02436779
, The International Journal of Advanced Manufacturing Technology, vol.96, issue.9-12, pp.3633-3650
An approximation approach for an integrated part quality inspection and preventive maintenance planning in a nonlinear deteriorating serial multi-stage manufacturing system, IFAC-PapersOnLine, vol.51, issue.11, pp.270-275, 2018. ,
URL : https://hal.archives-ouvertes.fr/hal-02436446
A metaheuristic method for optimising inspection strategies in serial multistage processes, International Journal of Productivity and Quality Management, vol.6, pp.289-303, 2010. ,
A particle swarm algorithm for inspection optimization in serial multi-stage processes, Applied Mathematical Modelling, vol.36, pp.1455-1464, 2012. ,
A particle swarm algorithm for optimising inspection policies in serial multistage production processes with uncertain inspection costs, International Journal of Computer Integrated Manufacturing, vol.28, pp.766-780, 2015. ,
Improved design of CMS by considering operators decision-making styles, International Journal of Production Research, vol.53, pp.3276-3287, 2015. ,
Unique NSGA-II and MOPSO algorithms for improved dynamic cellular manufacturing systems considering human factors, Applied Mathematical Modelling, vol.48, pp.655-672, 2017. ,
Economic optimization in a fixed sequence of unreliable inspections, Journal of the Operational Research Society, vol.54, pp.605-613, 2003. ,
Optimal allocation of inspection effort in a serial multi-stage production system, Computers and Industrial Engineering, vol.30, pp.387-396, 1996. ,
The impact of inspector fallibility on the inspection policy in serial production systems, Management Science, vol.28, pp.387-399, 1982. ,
Process improvement versus enhanced inspection in optimized systems, International Journal of Production Research, vol.23, pp.1233-1245, 1985. ,
A break even quality level a approach to location of inspection station in a multi-stage production process, International Journal of Production Research, vol.28, pp.29-45, 1990. ,
Design of an optimal sequence of interrelated sampling plans, Journal of the American Statistical Association, vol.59, pp.96-104, 1964. ,
Maintenance and quality: the missing link, Journal of Quality in Maintenance Engineering, vol.1, pp.20-26, 1995. ,
Integrated production, quality and maintenance References 92 models: an overview, Integrated Models in Production Planning, Inventory, Quality and Maintenance, pp.3-28, 2001. ,
Optimal screening plans for nonserial production systems, Management Science, vol.18, pp.550-559, 1972. ,
Some mathematical models of inspection along a production line (No. TR-36), 1968. ,
Strategic allocation of inspection effort in a serial, multi-product production system, IIE Transactions, vol.19, pp.13-22, 1987. ,
Quality control for products supplied with warranty, Operations Research, vol.46, pp.107-115, 1998. ,
Quantitative selection of inspection plans, Proceedings of the 1999 ASME Design Engineering Technical Conferences, 1999. ,
Inspection for circuit board assembly, Management Science, vol.43, pp.1198-1213, 1997. ,
Design and management of manufacturing systems for production quality, CIRP Annals -Manufacturing Technology, vol.63, pp.773-796, 2014. ,
URL : https://hal.archives-ouvertes.fr/hal-01056111
Optimization of process improvement and inspection location for serial manufacturing, International Journal of Production Research, vol.34, pp.395-405, 1996. ,
A Bayesian quality assurance model for a multistage production process, ASQC Technical Conference Transactions, pp.338-348, 1974. ,
Systems approach to the multistage manufacturing connected-unit situation, Naval Research Logistics Quarterly, vol.19, pp.493-500, 1972. ,
Cost minimizing single sampling plans with AIQL and AOQL constraints, Management Science, vol.20, pp.1112-1121, 1974. ,
Inspection allocation for multistage deteriorating production systems, IIE Transactions, vol.34, pp.1031-1041, 2002. ,
Towards optimization of inspection allocation Part I and II, Industrial Management, vol.17, issue.4, pp.7-11, 1975. ,
Optimal location of inspection station in a multistage production process, Management Science, vol.20, pp.1194-1200, 1974. ,
Economic design of specifications for 100% inspection with imperfect measurement systems, Quality Technology and Quantitative Management, vol.3, pp.127-144, 2006. ,
A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis, Reliability Engineering and System Safety, vol.94, pp.905-912, 2009. ,
Flexible inspection within an aggregated information environment, Computers & Industrial Engineering, vol.19, pp.224-228, 1990. ,
Dynamic programming analysis of special multi-stage inspection systems, IIE Transactions, vol.16, pp.115-125, 1984. ,
Optimal test point selection for sequential manufacturing processes, The Bell System Technical Journal, vol.51, pp.291-300, 1972. ,
Condition-based inspection scheme for condition-based maintenance, International Journal of Production Research, vol.50, pp.3920-3935, 2012. ,
Integrating production and quality control policies: A survey, European Journal of Operational Research, vol.69, pp.1-13, 1993. ,
Capacity planning under different inspection strategies, European Journal of Operations Research, vol.89, pp.302-312, 1996. ,
Inspector location in convergent production units, International Journal of Production Research, vol.23, pp.1153-1169, 1985. ,
Integrated models in production planning and scheduling, maintenance and quality: a review, International Journal of Industrial and Systems Engineering, vol.10, pp.21-50, 2012. ,
A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects, European Journal of Operational Research, vol.167, pp.663-678, 2005. ,
Optimisation of inspection stations by using simulated annealing, International Journal for Manufacturing Science and Technology, vol.2, p.59, 2000. ,
A hybrid inspection system for the multistage production process, International Journal of Production Research, vol.22, pp.63-69, 1984. ,
Imperfect inspection in a in a multi-workstation production process, Management Science, vol.20, pp.378-384, 1973. ,
Optimal inspection effort and scheduling for a manufacturing process with repair, European Journal of Operational Research, vol.85, pp.340-351, 1995. ,
Conceptual framework for emaintenance: Illustration by e-maintenance technologies and platforms, Annual Reviews in Control, vol.33, pp.220-229, 2009. ,
URL : https://hal.archives-ouvertes.fr/hal-00438191
An optimization model for selective inspection in serial manufacturing systems, International journal of production research, vol.42, pp.3891-3909, 2004. ,
The optimal location of inspection stations using a rule-based methodology, Computer and Industrial Engineering, vol.19, pp.272-275, 1990. ,
A genetic algorithm with tournament selection for optimising inspection allocation in multiproduct multistage production systems, International Journal of Simulation and Process Modelling, vol.6, pp.238-244, 2011. ,
Optimal adaptive control policy for joint machine maintenance and product quality control, European Journal of Operational Research, vol.171, pp.586-597, 2006. ,
Simultaneous determination of production cycle and inspection schedules in a production system, Management Science, vol.33, pp.1125-1136, 1987. ,
Planning quality inspection operations in multistage manufacturing systems with inspection errors, International Journal of Production Research, vol.36, pp.141-155, 1998. ,
Allocation of screening inspection efforts -A dynamic programming approach, Management Science, vol.10, pp.342-352, 1964. ,
Manufacturing system maintenance based on dynamic programming model with prognostics information, Journal of Intelligent Manufacturing, 2017. ,
Industry 4.0: A survey on technologies, applications and open research issues, Journal of Industrial Information Integration, vol.6, pp.1-10, 2017. ,
A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes, IIE Transactions, vol.38, pp.309-328, 2006. ,
Effective implementation of thee-constraint method in multi objective mathematical programming problems, Applied Mathematics and Computation, vol.213, pp.455-465, 2009. ,
Decision support system for the generation of inspection processes by the federation of business expertise (Doctoral dissertation, 2014. ,
A multi-objective optimization framework for an inspection planning problem under uncertainty and breakdown, Arts et Metiers ParisTech, 2015. ,
URL : https://hal.archives-ouvertes.fr/tel-01345201
Mathematical modelling of a robust inspection process plan: Taguchi and Monte Carlo methods, International Journal of Production Research, vol.53, pp.2202-2224, 2015. ,
URL : https://hal.archives-ouvertes.fr/hal-01794852
A biobjective robust inspection planning model in a multi-stage serial production system, International Journal of Production Research, vol.56, pp.1432-1457, 2017. ,
URL : https://hal.archives-ouvertes.fr/hal-02369513
Introduction to Statistical Quality Control, 2009. ,
An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms, Engineering Applications of Artificial Intelligence, vol.39, pp.157-167, 2015. ,
URL : https://hal.archives-ouvertes.fr/hal-02519423
Modelling maintenance effects on manufacturing equipment performance: results from simulation analysis, International Journal of Production Research, vol.52, pp.3287-3302, 2014. ,
Modelling re-entrant manufacturing systems with inspection stations, Journal of Manufacturing Systems, vol.15, pp.367-378, 1996. ,
Optimal maintenance of multi-component systems: a review, pp.263-286, 2008. ,
New quality cost models to optimize inspection strategies, IEEE Transactions on Electronics Packaging Manufacturing, vol.26, pp.328-337, 2003. ,
Optimizing the quality control station configuration, Naval Research Logistics (NRL), vol.54, pp.301-314, 2007. ,
A polynomial time algorithm for solving a quality control station configuration problem, Discrete Applied Mathematics, vol.156, pp.412-419, 2008. ,
Location of quality inspection stations: an experimental assessment of five normative heuristics, Decision Sciences, vol.15, pp.389-408, 1984. ,
Economic design of quality monitoring efforts for multi-stage production systems, IIE Transactions, vol.19, pp.81-87, 1987. ,
Robust possibilistic programming for socially responsible supply chain network design: A new approach. Fuzzy Sets and Systems, vol.206, pp.1-20, 2012. ,
A dynamic programming application in production line inspection, vol.9, pp.73-81, 1967. ,
Optimal and heuristic inspection schedules for multistage production systems, IIE transactions, vol.29, pp.1063-1071, 1997. ,
Inspection allocation planning with two types of workstation: WVD and WAD, International Journal of Advanced Manufacturing Technology, vol.25, pp.947-953, 2005. ,
Genetic algorithm modeling for the inspection allocation in reentrant production systems, Expert Systems with Applications, vol.36, pp.11287-11295, 2009. ,
Particle swarm optimization with mutation for the inspection allocation in reentrant production systems, IEEE International Conference on Machine Learning and Cybernetics (ICMLC), vol.3, pp.1025-1030, 2011. ,
A survey of models for allocating inspection effort in multistage production systems, Journal of Quality Technology, vol.18, pp.239-247, 1986. ,
Location and sequencing of imperfect inspection operations in serial multi-stage production systems, International Journal of Production Research, vol.29, pp.1645-1659, 1991. ,
Specialized inspection problems in serial production systems, European Journal of Operational Research, vol.80, pp.277-296, 1995. ,
An approximation approach to a trade-off among efficiency, efficacy, and References 97 equity for relief prepositioning in disaster management, Transportation Research Part E, vol.93, pp.485-509, 2016. ,
Towards a psychologically consistent cellular manufacturing system, International Journal of Production Research, vol.55, pp.492-518, 2017. ,
Evaluation of heuristics for inspection station allocation in serial production systems, The Proceedings of the 1990 Winter Simulation Conference, pp.919-922, 1990. ,
Allocation of quality control stations in multistage manufacturing systems, Computers and Industrial Engineering, vol.60, pp.473-484, 2011. ,
Inspection resource assignment in a multistage manufacturing system with inspection error model, International Journal of Production Research, vol.40, pp.1787-1806, 2002. ,
Inspection allocation planning for a multiple quality characteristic advanced manufacturing system, International Journal of Advanced Manufacturing Technology, vol.21, pp.494-500, 2003. ,
Quick decision-making support for inspection allocation planning with rapidly changing customer requirements, International Journal of Advanced Manufacturing Technology, vol.22, pp.633-640, 2003. ,
Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm, International Journal of Advanced Manufacturing Technology, vol.33, pp.746-755, 2007. ,
Strategic allocation of inspection stations for a flow assembly line: a hybrid procedure, IIE Transactions, vol.27, pp.707-715, 1995. ,
Inspection allocation in manufacturing systems a genetic algorithm approach, The Proceedings of the 1994 IEEE California international conference on robotics and automation, vol.4, pp.3537-3542, 1994. ,
Designing an optimal production system with inspection, European Journal of Operational Research, vol.52, pp.45-54, 1991. ,
An integrated production inventory model with reprocessing and inspection, International Journal of production Research, vol.26, pp.1299-1315, 1988. ,
An on-line computational model for inspection resource allocation, Journal of Quality Technology, vol.6, pp.167-174, 1974. ,
The warehouse location formulation as a special type of inspection problem, Management Science, vol.21, pp.986-988, 1975. ,
Contribution of simulation to the optimization of inspection plans for multi-stage manufacturing systems, Computers and Industrial Engineering, vol.57, pp.1226-1234, 2009. ,
Allocating solder-paste printing inspection in high volume electronics manufacturing, IIE Transactions, vol.36, pp.1171-1181, 2004. ,
Optimizing Inspection Strategies for Multi-Stage Processes: An Exploratory Modeling Framework and Simulation, Qualite? et Su?rete? de Fonctionnement, pp.2-9, 2003. ,
An evolutionary algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes, European Journal of Operational Research, vol.179, pp.621-633, 2007. ,
Joint optimisation of all inspection parameters for multistage processes: evolutionary algorithm and simulation, International Journal of Innovative Computing and Applications, vol.2, pp.170-177, 2010. ,
Inspection strategies for multistage production systems with time varying quality, International Journal of Production Research, vol.38, pp.837-853, 2000. ,
Information-based inspection allocation for real-time inspection systems, Journal of Manufacturing Systems, vol.20, pp.13-22, 2001. ,
Some results from model of dynamic inspection allocation, Computers and Industrial Engineering, vol.21, pp.355-358, 1991. ,
Flexible inspection systems for serial multi-stage production systems, IIE Transactions, vol.25, pp.16-26, 1993. ,
Inspection allocation in manufacturing systems using stochastic search techniques, IEEE Transactions on Systems, Man and Cybernetics, Part A (Systems & Humans), vol.26, pp.222-230, 1996. ,
The analysis of a simple class of multi-stage inspection plans, Management Science, vol.12, pp.685-693, 1966. ,
Model Building in Mathematical Programming, 2013. ,
Inspection and measurement in manufacturing: keys to process planning and improvement. Society of Manufacturing Engineers, 1996. ,
Optimal allocation of inspection effort in multistage manufacturing processes, Western Electric Engineer, vol.16, pp.3-16, 1972. ,
Sequential inspection under capacity constraints, Operations Research, vol.47, pp.410-422, 1999. ,
Coordinated quality control in a two-stage system, IEEE Transactions on Automatic Control, vol.44, pp.1166-1179, 1999. ,
The optimal allocation of inspection effort in a class of nonserial production systems, IIE Transactions, vol.13, pp.285-293, 1981. ,
Optimal inspection policies in serial production system including scrap rework and repair: An MILP approach, International Journal of Production Research, vol.25, pp.1451-1464, 1987. ,
A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty, Computers & Industrial Engineering, vol.74, pp.139-148, 2014. ,
Dynamic quality control in assembly systems, IIE Transactions, vol.32, pp.797-806, 2000. ,
An optimization model and multiple matching heuristics for quality planning in manufacturing systems, Computers and industrial engineering, vol.42, pp.91-101, 2002. ,